Will I be able to build my facility from the PEDS drawings?


There are many General Contractors that are familiar with dairy construction and thus able to construct the facility from the Five-G PEDS drawing package. However, if your General Contractor does not have dairy construction experience, additional drawings will likely be required. Five-G can provide these additional drawings, but they are not included in the scope of the PEDS service.